A paradigm shift to EWPC is urgently needed to change the status quo and start integrating distributed resources and good ideas into power sectors all over the world.

To all writers and readers,

Dear Mr. Pullins,

Your comments on utility trends are very interesting and timely. If I understand correctly your post, your opinion is that:

1) Nothing is being done about integrating distributed resources to control, operation and planning of the grid.

2) Good utilities ideas die at the utility-commission interface.

My opinion is that to integrate distributed resources and to absorve good ideas, power sectors all over the world need to undergo a proper paradigm shift as explained in article "Free Market and Central Planning, Under R1E2 ," which I posted today on EnergyBlogs.com.

Regards,

José Antonio Vanderhorst-Silverio, Ph.D.

Ref: All the issues in the same room

Updated from original.
[script type="text/javascript">
_uacct = "UA-1837247-1";
urchinTracker();
[/script>

 

 
Toolbox
Blog Editor
Search
Calendar
Recent CommentsRecent Comments
RSS
Energy Central
Power Network


Copyright © 1996-2008 by CyberTech, Inc. All rights reserved.
Energy Central ® is a registered trademark of CyberTech, Incorporated.
CyberTech does not warrant that the information or services of Energy Central will meet any specific requirements; nor will it be error free or uninterrupted; nor shall CyberTech be liable for any indirect, incidental or consequential damages (including lost data, information or profits) sustained or incurred in connection with the use of, operation of, or inability to use Energy Central.
2821 S. Parker Rd. Ste 1105 Aurora, CO 80014
Contact: Phone - 303-782-5510 Fax - 303-782-5331 or service@energycentral.com.